Flats

Construction of 30 flats at Besançon (25)

  • Low-Energy Consumption Building
  • Installation of high walls
  • Installation of poured concrete wall (4,000 m ²)
  • Installation of pre-cast slab flooring of 2,000m²
  • Duration of major structural works: 8 months