Flats

Construction of 42 flats at Besançon (25)

  • Low-Energy Consumption Building
  • Installation of high walls
  • Installation of poured concrete wall (3,900 m²)
  • Installation of pre-cast slab flooring of 4,000 m²
  • Duration of major structural works: 8 months