Flats

Construction of 9 flats in Dijon (Côte d'Or)

Brief description of the works:

  • Low-Energy Consumption Building
  • Installation of poured concrete wall (1,105 m²)
  • Implementation paves full on prepaving stone (840 m²)
  • Duration of major structural works: 3 months