Construction of a community centre at Arc-lès-Gray (70)

  • Low-Energy Consumption Building
  • Installation of high walls
  • Installation of poured concrete walls
  • Installation of pre-cast slab flooring (4,000m²)
  • Duration of major structural works: 16 months